
Fleet charging
Logistics, delivery & truck charging
Charging for logistics parks, delivery hubs and freight corridors — sized to your vehicles, shifts and routes, with solar canopies to cut energy costs.
Talk to the fleet teamWhat Relux builds
Mini trucks & LCVs
120 kW and above cuts a mini truck's charge from about 45 minutes to under 30 minutes as capacity increases.
Heavy trucks
High-power stations rated 240 kW and above, engineered for electric trucks and freight vehicles at logistics parks and freight corridors.
Solar canopy depots
Solar carports over heavy-vehicle bays offset charging costs, with scheduling software to spread charging across shifts.
Key numbers
| Vehicle | Recommended charger capacity | Expected charging time |
|---|---|---|
| Mini trucks / LCVs | 120 kW and above | About 45 min falls to under 30 min as capacity rises |
| Electric trucks | 240 kW+ hubs | Under an hour vs several hours at lower capacity |
| Delivery vans & cars | 30 kW depot + 60 kW DC | Overnight at depot, top-ups during routes |
Frequently asked questions
Which station capacity should I choose for a mini truck?
120 kW and above works well — charging time drops from about 45 minutes to under 30 minutes as capacity increases.
Why does my truck take longer to charge than a car?
Bigger vehicles have bigger batteries, so they take longer even at the same charger; higher-capacity stations (240 kW+) narrow the gap.
Can Relux build charging at our logistics park?
Yes — Relux designs depot charging with high-power DC chargers, solar canopies, battery storage and fleet scheduling software, and supports it after installation.
Electrifying your fleet?
Share your vehicles, routes and depots — Relux will size the charging.